Australia AUD
VBreathe

Case Study

pdf
Case Study
Severe Mould Remediation using EnviroGuard PRO™ X

In a case study carried out in 2023, a 600m3 office building in Cairns, Queensland was found to have serious mould contamination and needed to be evacuated prior to remediation. EnviroGuard PRO™X units were used throughout the remediation and the results from the post-remediation verification were impressive. In a report on the activity it was stated that: “In post-remediation viable sampling, a 100% clinically clean status for both surfaces and air was achieved”.

Back to top

Please select your region/currency:

Australia Australia (AUD) Denmark Denmark (kr) Netherlands Netherlands (EUR) Norway Norway (kr) Sweden Sweden (kr) Poland Poland (zł) Finland Finland (EUR)